首页> 美国政府科技报告 >Evaluation of Secondary-System Layup and Cleanup Practices and Processes. Final Report (PWR)
【24h】

Evaluation of Secondary-System Layup and Cleanup Practices and Processes. Final Report (PWR)

机译:评估二级系统上层和清理实践和过程。最终报告(pWR)

获取原文

摘要

The study of PWR secondary system layup and cleanup practices was undertaken to evaluate current and proposed methods of corrosion product control associated with extended plant outages. The overall goal was to evaluate means for significantly minimizing the steam generator sludge burden. The study included a field survey of 14 representative PWR plants, an extensive literature search and an evaluation of corrosion product transport data. Recommendations for layup and cleanup system processes were derived from these practices and related information. Estimates of the potential benefits to be expected in the control of corrosion products by controlled layup environments during extended outages and by cleanup following such outages are provided. Cleanup during all, or most, phases of operation is indicated as being most beneficial. Layup and cleanup system process design information is also provided. (ERA citation 08:035789)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号