首页> 美国政府科技报告 >Methods for Review and Evaluation of Emergency Procedure Guidelines Volume II: Applications to Westinghouse Plants.
【24h】

Methods for Review and Evaluation of Emergency Procedure Guidelines Volume II: Applications to Westinghouse Plants.

机译:审查和评估紧急程序指南的方法第二卷:对西屋工厂的应用。

获取原文

摘要

Systematic methods for finalizing, reviewing, or developing improved emergency procedure guidelines are applied to a Westinghouse PWR plant. The methods are based on the use of operator action event trees (OAETS) which document the key operator actions and plant symptoms associated with the various stages of risk significant multiple failure accident sequences. The application of the methodology utilizes OAETS developed for the Zion 1 PWR and the Westinghouse Owners Group's Emergency Response Guidelines. Since the details of the Westinghouse Function Restoration Guidelines (FRGs) were not yet complete, this examination did not take the form of an evaluation of the correctness or completeness of the final guidelines. Rather, the product of this examination was a delineation of the necessary characteristics which each FRG must possess when it is developed in complete detail.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号