首页> 美国政府科技报告 >Capitol Concrete Solar Industrial Process Heat Experiment. Final Technical Report, May 30-November 24, 1982
【24h】

Capitol Concrete Solar Industrial Process Heat Experiment. Final Technical Report, May 30-November 24, 1982

机译:国会大厦混凝土太阳能工业过程热实验。最终技术报告,1982年5月30日至11月24日

获取原文

摘要

The nation's first point focussing solar industrial process heat plant was designed, installed, and operated for evaluation at Capitol Concrete Products. The solar collector, which was designed and fabricated by PKI, was incorporated into a plant to provide steam for curing concrete blocks in an autoclave at pressures of 15 to 60 psig. The plant was operated for a four month period of technical evaluation (July 26-November 24, 1982), subsequent to final check out testing. (ERA citation 08:020086)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号