首页> 美国政府科技报告 >Fabrication, Interfacing, and Testing of a Special-Purpose Power-System Simulator. Topical Report, October 3-December 31, 1982
【24h】

Fabrication, Interfacing, and Testing of a Special-Purpose Power-System Simulator. Topical Report, October 3-December 31, 1982

机译:特殊用途电力系统模拟器的制造,接口和测试。专题报告,1982年10月3日至12月31日

获取原文

摘要

Some work has been done on modification of DCU calculation routines but the majority of the time has been spent on the Simulator Initialization Routine. As expected it has proved to be difficult to accommodate the unusual conditions that could exist after setting DCU's because of defaults or erroneous estimation of initial conditions for the DCU Calculation routines. Reasonably good results have been obtained for some individual worst case conditions but additional tests are required for various combinations of worst case conditions for different modules before the routine can be considered to be satisfactory. A small amount of work has also been done on the Simulator User's manual. (ERA citation 08:012285)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号