首页> 美国政府科技报告 >H-Coal Pilot Plant: Final Equipment Inspection (With Separate Proprietary Appendix)
【24h】

H-Coal Pilot Plant: Final Equipment Inspection (With Separate Proprietary Appendix)

机译:H-Coal试验工厂:最终设备检查(附独立专有附录)

获取原文

摘要

Since completion of the second major maintenance turnaround on February 28, 1982, the H-Coal Pilot Plant operated for 133.2 days on coal and 54.8 days on oil circulation. Approximately 9600 tons of Wyodak, 12,976 tons of Illinois No. 6 and 3329 tons of Kentucky No. 9 coal (see analyses, Attachment 1, Page 1.0) have been processed in three separate test runs. On November 11, 1982, the final test run was voluntarily terminated following depletion of operational funds and satisfactory completion of operating objectives. The plant was then readied for the third and final shutdown inspection. This report summarizes the observations and results of the final equipment inspection for the period of November 22, 1982, to January 22, 1983. (ERA citation 08:055359)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号