首页> 美国政府科技报告 >EEG Review Comments on the Geotechnical Reports Provided by DOE to EEG under the Stipulated Agreement Through March 1, 1983.
【24h】

EEG Review Comments on the Geotechnical Reports Provided by DOE to EEG under the Stipulated Agreement Through March 1, 1983.

机译:EEG评论美国能源部根据规定的协议向EEG提供的岩土报告的评论截止日期为1983年3月1日。

获取原文

摘要

The purpose of the Environmental Evaluation Group (EEG) is to conduct an independent technical evaluation of the potential radiation exposure to people from the proposed federal radioactive Waste Isolation Pilot Plant (WIPP) near Carlsbad, in order to protect the public health and safety and ensure that there is minimal environmental degradation. Analyses are conducted of available data concerning the proposed site, the design of the repository, its planned operation, and its long-term stability. These analyses include assessments of reports issued by the US Department of Energy (DOE) and its contractors, other federal agencies and organizations, as they relate to the potential health, safety and environmental impacts from WIPP. This publication is a compilation of EEG's written comments on each of the following reports: Deep Dissolution; Breccia Pipes; DMG Hydrology; Natural Resources; Plans for Site and Preliminary Design Validation; Plans for Simulated Waste; Brine Reservoir Report; Disturbed Zone Exploration; and Fracture Flow in the Rustler Aquifers.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号