首页> 美国政府科技报告 >Task Analysis of Nuclear Power Plant Control Room Crews. Volume 1. Project Approach and Methodology.
【24h】

Task Analysis of Nuclear Power Plant Control Room Crews. Volume 1. Project Approach and Methodology.

机译:核电厂控制室人员任务分析。第1卷。项目方法和方法。

获取原文

摘要

The objective of the project was to conduct a crew task analysis that would provide data for evaluating six areas: (1) human engineering design of control rooms, (2) the numbers and types of control room operators needed with requisite skills and knowledges, (3) operator qualification and training requirements, (4) normal, off-normal, and emergency operating procedures, (5) job performance aids, and (6) communications. A generic structural framework for assembling the large task data base was employed from observations and video-taping of crew behaviors during 44 operating sequences conducted at 8 power plant sites.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号