首页> 美国政府科技报告 >Qualification of the B and W Mark B Fuel Assembly for High Burnup. Ninth Semi-Annual Progress Report, July-December 1982
【24h】

Qualification of the B and W Mark B Fuel Assembly for High Burnup. Ninth Semi-Annual Progress Report, July-December 1982

机译:高燃耗的B和W mark B燃料组件的资格。 1982年7月至12月第九次半年度进展报告

获取原文

摘要

The objectve of this Department of Energy-sponsored program is to demonstrate the extended-burnup performance of Babcock and Wilcox-designed Mark B (15 x 15) pressurized water reactor fuel. Assembly average burnups of 40,000 MWd/mtU, about 20% greater than typical discharge burnups, have been attained in Duke Power Company's Oconee Unit 1 reactor; burnups in excess of 50,000 MWd/mtU are planned. This report, covering the period from July through December 1982, is the ninth semi-annual progress report for the program. During this period, assembly 1D45 continued its fifth cycle of irradiation in Oconee 1. It will achieve an assembly average burnup of more than 50,000 MWd/mtU by the end of the cycle in mid 1983. Efforts during this report period included fuel rod oxide thickness measurements using two nondestructive eddy current measurement systems. Also, LOCA evaluations for Mark B fuel plants were completed and show the predicted LOCA cladding temperature at extended-burnup fuel conditions to be bounded by beginning-of-life results. (ERA citation 08:046066)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号