Brief Summary of Staffing Levels at Fermilab During Initial Construction Years

机译:Fermilab初期建设期间人员配备水平简介

获取原文

摘要

This paper very briefly summarizes the work of the various groups that were involved from the beginning through the end of the initial construction phase of the Fermilab project (defined here to be July 1, 1972) and the final construction or completion phase which is here defined as December 31, 1973. The numbers in this report have been gathered by examining the personnel records of Fermilab with the research being done by Chuck Marofske, the Head of Laboratory Services and his staff and by assembling information from the memories of people still with the laboratory in 1983. Since there was much mobility within the laboratory during the construction years and frequent reorganizations were the norm, the numbers presented herein can not be considered to be more accurate than about +- 5%. (ERA citation 09:012589)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号