首页> 美国政府科技报告 >Power Ramping of Super-Ramp Test Fuel Rods: Final Irradiation Report: The Super-Ramp Project
【24h】

Power Ramping of Super-Ramp Test Fuel Rods: Final Irradiation Report: The Super-Ramp Project

机译:超级斜坡测试燃料棒的功率斜坡:最终辐照报告:超级斜坡项目

获取原文

摘要

The power ramp testing of the 44 fuel rods started in August 1980 and was finished in November 1982. The rods form nine groups of 4 to 8 rods in each group. Detailed rod data are found in the fabrication and base irradiation reports. The irradiation histories during the ramp testing are presented in the nine Appendices A to I, one for each group of rods. 2 refs., 4 figs., 3 tabs.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号