首页> 美国政府科技报告 >Tube Bank C - Metal Wastage: Status Report, August 1983
【24h】

Tube Bank C - Metal Wastage: Status Report, August 1983

机译:Tube Bank C - metal Wastage:status Report,1983年8月

获取原文

摘要

The Experimental Pressurised Fluidized Bed Combustion Facility at Grimethorpe, South Yorkshire, UK incorporates an in-bed tube bank. During the operation of the facility between June and September 1982, an unexpectedly high degree of metal wastage occurred from the external surfaces of this tube bank. Measures were taken to reduce the rate of metal wastage and extend the life of the tube bank, which was subsequently replaced in July 1983 after a total operating period of 1222 hours of coal burning. Using small-scale fluidized bed cold models, experimental investigations were carried out to determine measures to reduce the metal wastage. The results indicated that metal wastage would be reduced by the following changes: a reduction in the fluidizing velocity; the attachment of studs or axial fins to the tubes; a reduction in the height of the space between the distributor plate and the bottom of the tube bank; and the elimination, where possible of any large gaps within the tube bank. Such changes have been incorporated into the design of the replacement tube bank. This has now been installed and has experienced significantly less metal wastage. 9 references, 6 tables, 34 figures. (ERA citation 10:009543)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号