首页> 美国政府科技报告 >Acceptance-Testing Procedures for Air-Line Supplied-Air Suits
【24h】

Acceptance-Testing Procedures for Air-Line Supplied-Air Suits

机译:空气供应空气服的验收测试程序

获取原文

摘要

Procedures and requirements have been established to permit the Department of Energy contractors to submit needed air-line supplied-air suits for testing and evaluation. The testing is to be conducted by the Personnel Protection Studies Section, Industrial Hygiene Group, of the Los Alamos National Laboratory. The adequacy of performance, recommendations for improvement and/or operational restrictions of the devices are to be made by the Department of Energy Contractors' Respirator Advisory Committee. The responsibility of acceptance or nonacceptance of these devices will be with the Department of Safety, Office of Operational Safety. The test equipment, test methods, design, and performance criteria for air-line supplied-air suits are prescribed. (ERA citation 09:046755)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号