Transuranium Processing Plant Report of Production, Status, and Plans for October 1, 1980-March 31, 1983

机译:超铀加工厂1980年10月1日至1983年3月31日的生产,现状和计划报告

获取原文

摘要

Operations during this report period are summarized, and the amounts of materials obtained and shipped are listed. Proposed processing schedules and anticipated yields of various products in the near future are outlined. The original and current contents ( exp 252 Cf and exp 248 Cm) of existing neutron sources made at TRU, as well as the individuals to whom these sources are currently loaned, are tabulated. Also, a variety of special projects that required use of the facilities available at TRU are described. (ERA citation 09:050350)