首页> 美国政府科技报告 >Development and Test of a High COP Rankine Heat Pump for Generation of Process Steam. Final Report, Phase 2: Fabrication and Test
【24h】

Development and Test of a High COP Rankine Heat Pump for Generation of Process Steam. Final Report, Phase 2: Fabrication and Test

机译:高COp兰金热泵生产过程蒸汽的研制与试验。最终报告,第2阶段:制造和测试

获取原文

摘要

The steps taken to assemble and test the Rankine-driven heat pump are described. The following were performed: component bench tests, skid assembly, skid tests, system assembly, preliminary (cold) tests, alarms and safeties checkout, and hot tests. The test configurations are presented. Results are discussed for performance, endurance, and special tests. The systems cost analysis is included. (ERA citation 10:004827)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号