首页> 美国政府科技报告 >EDS Coal Liquefaction Process Development: Phase V Interim Report. EDS Hybrid Boiler Development Program. Volume III. Cold Flow Model Study
【24h】

EDS Coal Liquefaction Process Development: Phase V Interim Report. EDS Hybrid Boiler Development Program. Volume III. Cold Flow Model Study

机译:EDs煤液化工艺开发:第五阶段中期报告。 EDs混合锅炉开发计划。第三卷。冷流模型研究

获取原文

摘要

This is an interim technical progress report for US Department of Energy Cooperative Agreement No. FC05-77ET10069, EDS Coal Liquefaction Process Development, Phase V. Funding is shared by US Department of Energy, Exxon Company, USA (a division of Exxon Corporation), Electric Power Research Institute, Japan Coal Liquefaction Development Company, Phillips Coal Company, Anaconda Minerals Company, Ruhrkohle A.G., and ENI. This agreement covers the period January 1, 1977 through December 31, 1985. This interim report documents work carried out by Combustion Engineering, Inc. under a contract to Exxon Research and Engineering Company and was prepared by Combustion Engineering, Inc. This report is the third of four by Combustion Engineering, Inc. on the development phase of the Hybrid Boiler program. This volume documents the results of studies in a one-sixteenth scale, three dimensional, isothermal, air flow model to ensure adequate gas distribution entering and through the process heater coals situated in the back pass of a hybrid boiler and in a computer model to evaluate the process coils thermal performance. 5 references, 37 figures, 3 tables. (ERA citation 10:012039)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号