首页> 美国政府科技报告 >Refinement and Evaluation of Basic Longwall Dust-Control Techniques. Twenty-Eighth Monthly Technical Letter Report, August 1984
【24h】

Refinement and Evaluation of Basic Longwall Dust-Control Techniques. Twenty-Eighth Monthly Technical Letter Report, August 1984

机译:基础长壁除尘技术的改进与评价。第二十八期月度技术信函报告,1984年8月

获取原文

摘要

The objective is to evaluate the effectiveness of available dust-control technology for double-drum shearer longwall sections. A preliminary visit was made to Harris No. 2 Mine, Eastern Associated Coal Corporation, on August 9, 1984, to assess the suitability of the longwall panel and shearer drums for a comparison of the dust-control effectiveness of Thru-flush bits and pick-face-flushing vane-mounted sprays. The section and drums were found acceptable and sampling began August 15, 1984. The sampling program consisted of two distinct test periods for each spray system (A-B-A-B) and was completed on August 28, 1984. A total of 17 cutting passes was sampled with the Thru-flush bits and 19 cutting passes were sampled with the vane sprays. Preliminery analysis of the data has begun. For the first test period with Thru-flush bits, the average perpass dust levels for H implies T cuts at the shearer and tailgate sampling locations were 5.4 mg/m exp 3 and 7.9 mg/m exp 3 , respectively. The average water flow to the shearer was 42.4 gpm at a water pressure of 225 psi, as measured with the BCRNL water meter installed in the shearer line just inby the water filter at the stageloader. The water pressure at the drum spray nozzle was checked and found to be 45 psi, with all shearer water sprays operating. (ERA citation 09:045380)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号