首页> 美国政府科技报告 >Battery Energy Storage Test (BEST) Facility. Third Progress Report, Review and Summary Through June 1983
【24h】

Battery Energy Storage Test (BEST) Facility. Third Progress Report, Review and Summary Through June 1983

机译:电池储能测试(BEsT)设施。第三份进展报告,审查和摘要至1983年6月

获取原文

摘要

The Battery Energy Storage Test (BEST) Facility is a national center for testing and evaluating battery energy storage systems, including associated electrical conversion equipment developed for use on electric power grids. This interim report covers the period January 1980-June 1983 in which the following results were achieved: completed baseline facility construction including ac link to 13.8-kV PSE and G substation; installed all operating equipment; completed operational acceptance test; prepared procedures and protocols for all phases of operation, maintenance, data management, personnel training, and public relations; operated 1.8-MWh station battery, 2.5-MW ac/dc converter, and computer control system for one year in a series of cycling modes representing various utility applications; prepared Bay-2 for installation in September 1983 of a 500-kWh zinc chloride battery including a 300-kW ac/dc converter and control system; planned for installation in October 1983 in Bay 1 a 500-kW, 500-kWh lead-acid battery with converter and control system; and demonstrated that the facility does meet project objectives as a focal point for a national program to commercialize battery energy storage systems. (ERA citation 09:030978)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号