首页> 美国政府科技报告 >Chronology of the Beryllium Replacement Shutdown at the High Flux Isotope Reactor (HFIR), 1983
【24h】

Chronology of the Beryllium Replacement Shutdown at the High Flux Isotope Reactor (HFIR), 1983

机译:1983年高通量同位素反应堆(HFIR)中铍置换关闭的年代学

获取原文

摘要

In addition to the permanent beryllium reflector, several other components were replaced. The outer shroud and lower tracks were replaced. The new control rod access plugs and the upper tracks were installed. Replacement of collimator tubes for HB-1 and -2 are tentatively slated for the next permanent beryllium changeout. Inspection of the reactor vessel, the vessel-to-nozzle welds, core support structure, and vessel internal cladding showed them to be in acceptable condition. The highest, accumulative radiation doses received by Reactor Operations personnel during the shutdown, in mrem, were 665, 606, and 560; the highest for P and E personnel were 520, 505, and 475. (ERA citation 09:022542)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号