首页> 美国政府科技报告 >TVA/DOE Analysis of the Operation of an Electric Power System with and Without Wind Generation. Volume 2. Hypothetical Modification of the TVA Power System to Accommodate Wind Generation. Final Report
【24h】

TVA/DOE Analysis of the Operation of an Electric Power System with and Without Wind Generation. Volume 2. Hypothetical Modification of the TVA Power System to Accommodate Wind Generation. Final Report

机译:有风和无风电力系统运行的TVa / DOE分析。第2卷。用于容纳风力发电的TVa电力系统的假设修改。总结报告

获取原文

摘要

The overall objective of this investigation was to determine the impacts of significant amounts of intermittent generation - in this case, wind generation on the operations of an electric power system. In a program sponsored by the US Department of Energy (DOE), the Tennessee Valley Authority (TVA) conducted an analytical investigation of the impact of intermittent wind generation on the operations of the TVA power system. The investigation was divided into three phases. The first phase was the documentation of the 1978 TVA power system, which was selected as the base case. The second phase dealt with the hypothetical reconfiguration of the TVA transmission system to accommodate up to 8480 MW of wind-generating capacity. The third phase was the simulation of the daily operations of the TVA system with wind generation. (ERA citation 10:020395)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号