首页> 美国政府科技报告 >Advanced Utility Simulation Model (AUSM): Regionalized Projections of End-Use Electricity Demand
【24h】

Advanced Utility Simulation Model (AUSM): Regionalized Projections of End-Use Electricity Demand

机译:高级效用仿真模型(aUsm):终端用电需求的区域化预测

获取原文

摘要

This report documents the methodology used to translate national control forecasts into the specific regional data needed to drive the sector models. Separate reports are being prepared for each sector model because the driver data are highly specific. Although the configuration of the driver data for each sector model is different, a common regionalization scheme is employed to prepare the driver data. The Argonne Regionalization Activity Module (ARAM) was developed to systematically generate regional and state forecasts of energy and economic variables required by the sector models of the TG-B emissions model set. This report focuses on the generation and description of the driver data for the Advanced Utility Simulation Model. (ERA citation 12:005257)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号