首页> 美国政府科技报告 >Testing, Data Analysis and Engineering Services on Lead-Acid Load Leveling Batteries. Phase 2. Final Contract Report, January 1, 1984-June 30, 1985
【24h】

Testing, Data Analysis and Engineering Services on Lead-Acid Load Leveling Batteries. Phase 2. Final Contract Report, January 1, 1984-June 30, 1985

机译:铅酸负载均衡电池的测试,数据分析和工程服务。阶段2.最终合同报告,1984年1月1日至1985年6月30日

获取原文

摘要

Preprototype 3100 Ah load-leveling cells, developed on ANL Contract 31-109-38-4951, have been cycled at 40 +- 5 deg C on an 80% DoD, 2 cycles per day regime for 2340 cycles. Three of four competing designs continue to cycle, meeting all capacity and voltage requirements. This data at 40 +- 5 deg C are compared to emerging cycle data from similar cells on test at ANL National Battery Test Laboratory at 50 and 60 deg C. Cycle life goals at 40 and 50 deg C have been met. Tests are continuing in an effort to demonstrate their equivalency to 4000 cycles at 25 deg C on the same regime. (ERA citation 11:003020)

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号