首页> 美国政府科技报告 >Direct Liquefaction Technology Assessment. Task 1. Technical Readiness of the Developing Plant Functions
【24h】

Direct Liquefaction Technology Assessment. Task 1. Technical Readiness of the Developing Plant Functions

机译:直接液化技术评估。任务1.发展中植物功能的技术准备

获取原文

摘要

A review was made of the technological readiness of processes for the direct liquefaction of coal. The review was based principally on the experience gained in large pilot plants such as SRC, H-Coal, and EDS. It was concluded that a commercial-scale direct coal liquefaction facility could be designed and constructed using available technology to give predictable yields and acceptable mechanical performance. Although some problems would undoubtedly be associated with scale-up in a large plant, there is no reason to believe that the occurrence of these would exceed a normal level. After large-scale testing, two major equipment items, the fired preheater and the high-pressure vapor-liquid separator, might be redesigned to significantly reduce costs. Likewise, recent developmental results indicate that substantially greater yields of the more desirable liquid products may be attainable through process modification, which could have a significant effect on the economic viability of direct coal liquefaction. The report discusses the following plant functions in detail: coal slurry preparation, fired preheaters, coal dissolution, high-pressure vapor-liquid separation, residue processing, hydroclone operation, and product upgrading. Critical equipment components such as high-pressure pumps, block valves, letdown valves, and instrumentation are also discussed. 52 figs., 78 tabs. (ERA citation 10:048038)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号