首页> 美国政府科技报告 >Processing and Problems in Manufacturing a Ti-Modified Nb sub 3 Sn MJR Billet. Volume 2
【24h】

Processing and Problems in Manufacturing a Ti-Modified Nb sub 3 Sn MJR Billet. Volume 2

机译:Ti改性Nb sub 3 sn mJR钢坯的制备工艺及存在的问题。第2卷

获取原文

摘要

This report is submitted to complete Task II of University of California Order Number 4321405. Task I had Teledyne Wah Chang Albany (TWCA) assemble and process by the Modified Jelly Roll (MJR) method a Ti-modified Nb sub 3 Sn superconductor billet. This billet was identified as M103 by TWCA. The billet matrix is nominally composed of copper 13.5 wt % tin bronze sheet and niobium 1.2 wt % titanium expanded metal with a volume ratio of three parts bronze to one part niobium alloy. All processing steps and problems encountered in manufacturing billet M103 are described in this report. (ERA citation 10:044645)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号