首页> 美国政府科技报告 >Great Plains ASPEN Model Development: ASPEN Sizing Enhancements. Final Topical Report
【24h】

Great Plains ASPEN Model Development: ASPEN Sizing Enhancements. Final Topical Report

机译:Great plains aspEN模型开发:aspEN尺寸增强。最终专题报告

获取原文

摘要

In preparing cost estimates for the various sections of the Great Plains Coal Gasification Plant, the equipment sizing methods for the major equipment items were checked. The sizing results obtained from ASPEN were compared with the sizing results obtained by using the Halcon SD Group's (HSD) own sizing methods and in-house computer programs. Where there were significant differences between the ASPEN sizing results and our own results, the subroutine coding was checked to determine where the differences arose. Modifications were then made to the ASPEN routines where it was thought that HSD's methods would significantly enhance the quality of ASPEN. The following ASPEN sizing subroutines were modified: (1) STW01 - ASPEN tray tower sizing; (2) SVS11 - ASPEN vertical vessel sizing; (3) SVS01 - ASPEN horizontal vessel sizing; and (4) CPVVTH - ASPEN vertical vessel/tower shell thickness and weight determination. Modifications were made to sizing calculations contained in the following ASPEN COST subroutines: (1) CPC01 - ASPEN centrifugal pump costing; and (2) CPC02 - ASPEN centrifugal compressor costing. Modifications also were made to sizing calculations contained in the following ASPEN UOS subroutines: (1) UPC01 - ASPEN pump model; and (2) UPC02 - ASPEN compressor model. A new ASPEN COST subroutine that contains sizing calculations was developed, CPC04 - ASPEN reciprocating compressor costing. 4 references. (ERA citation 10:022281)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号