首页> 美国政府科技报告 >Application of the Leak-Before-Break Approach to Westinghouse PWR Piping
【24h】

Application of the Leak-Before-Break Approach to Westinghouse PWR Piping

机译:断裂前泄漏法在西屋压水堆管道中的应用

获取原文

摘要

NUREG 1061, Volume 3, puts forth criteria that can be used to demonstrate leak-before-break for high energy piping systems. An accepted leak-before-break methodology for PWR primary loop piping already exists. The purpose of this effort was to extend the leak-before-break methodology to high energy piping systems other than the reactor coolant loop piping. A detailed leak-before-break evaluation of the pressurizer surge line is presented in this report. The pressurizer surge line was selected as a typical case because this line would typically yield large fatigue crack growth because of the steady state fluctuations associated with the pressurizer fluid. Based on the evaluation it is concluded that for the typical surge line considered in this investigation, guillotine breaks should not be used as a part of the structural design basis.nAs a second part of this investigation, the high energy piping systems inside containment were prioritized from the standpoint of determining the applicability of the leak-before-break approach. The priorities were based on three considerations. First the potential for pressure boundary failure in high energy lines with diameters 6 inches and larger was reviewed qualitatively by addressing six potential failure mechanisms.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号