Interim Letter Report Verification Survey of Partial Grids H19, J21, J22, X20, and X21 at the David Witherspoon, Inc., 1630 Site Knoxville, Tennessee

机译:位于田纳西州诺克斯维尔市1630号David Witherspoon公司的部分电网H19,J21,J22,X20和X21的临时信件报告验证调查

获取原文

摘要

The U.S. Department of Energy (DOE) has requested that the Oak Ridge Institute for Science and Education (ORISE) conduct verification surveys of available grids at the David Witherspoon Incorporated 1630 Site (DWI 1630) in Knoxville, Tennessee. On March 6, 2008, an independent verification team (IVT) from ORISE conducted verification activities of the excavated areas in partial grids H19, J21, J22, X20, and X21. The DWI 1630 Site received, processed, stored, and shipped scrap metal, including metal contaminated with radiological and chemical contaminants. Past site characterization activities identified numerous radiological and chemical contaminants, including uranium, thorium, heavy metals, polychlorinated biphenyls (PCBs), asbestos, and organic compounds. The contaminants have been noted in various media on the site, including debris, soil, sediment, groundwater, and surface water. There were no buildings located in the subject areas during site operations. The DOEs decommissioning contractor, Bechtel Jacobs Company, LLC. (BJC), has performed characterization surveys, subsequent remediation, and verification surveys and sampling within the subject area. The areas have not been backfilled pending results from the Independent Verification (IV) survey.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号