首页> 美国政府科技报告 >Restoration, Testing and Repair of 30-Year Old Cooling Towers at the Paducah Gaseous Diffusion Plant, Phase 2
【24h】

Restoration, Testing and Repair of 30-Year Old Cooling Towers at the Paducah Gaseous Diffusion Plant, Phase 2

机译:第2阶段帕迪尤卡气体扩散厂30年冷却塔的修复,测试和维修

获取原文

摘要

Early in 1980, a comprehensive reliability study was made to ascertain the ability of the present 30 plus year old recirculating water system to meet the anticipated load demand through the year 2000. The anticipated load demand would require that 99% of the recirculating water equipment and cooling towers be in service at all times. This project was designed to determine if the present cooling tower system could be upgraded to handle the load demand or would additional cooling towers have to be constructed. One of the recommendations of this study was to replace the original redwood mortise lock fill with PVC fill in four fan cells of a 14 fan cell cross-flow tower for test purpose. This paper deals with this prototype installation and testing procedure. After project completion, a CTI Performance Test confirmed the four cells were performing at 100.3 percent of design.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号