首页> 美国政府科技报告 >Drilling, Sampling, and Well-Installation Plan for the IFC Well Field, 300 Area; Technical rept
【24h】

Drilling, Sampling, and Well-Installation Plan for the IFC Well Field, 300 Area; Technical rept

机译:国际金融公司井场钻探,取样和安装计划,300区;技术部门

获取原文

摘要

The 300 Area was selected as a location for an IFC because it offers excellent opportunities for field research on the influence of mass-transfer processes on uranium in the vadose zone and groundwater. The 300 Area was the location of nuclear fuel fabrication facilities and has more than 100 waste sites. Two of these waste sites, the North and South Process Ponds received large volumes of process waste from 1943 to 1975 and are thought to represent a significant source of the groundwater uranium plume in the 300 Area. Geophysical surveys and other characterization efforts have led to selection of the South Process Pond for the IFC.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号