Feed Materials Production Center. Final phase-in report volume 15 of 15 nine month program plan, October 25, 1985--December 31, 1985

机译:饲料原料生产中心。 1985年10月25日 - 1985年12月31日的最终阶段报告第15卷,共15个月的计划

获取原文

摘要

The purpose of the nine month program plan is to document all the activities that are scheduled for January-September, 1986 at FMPC. The intent of preparing the nine month program plan was to prepare a description of authorized work, budget the work on a month-to-month basis and schedule the completion of work. The milestones in the WMCO Transition Plan that included the gathering of FY86 work scope and budget information in addition to issuing the 9-month Program Plan assumed the existence of an existing budget program that priced and budgeted work monthly. In the absence of a budget computer program, an IBM P.C, with extended memory was leased to handle the volume of budget data. The planning concept in the nine month program was based on defining manageable work, scheduling small increments of work, and estimating the resources in labor, material and services required to accomplish the work. Then, as the work plan is implemented, the accomplishments and actual costs are reported against the plan and significant variances are identified for management action, if required. The two work tasks which were scheduled in the Transition Plan for preparing the Nine Month Program Plan were: (1) collect FY86-88 financial data, production levels and capital construction schedules for FMPC, and (2) coordinate the preparation of the program plan consistent with C/SCSC where practical.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号