首页> 美国政府科技报告 >Bolmen Tunnel Project - Evaluation of Geophysical Site Investigation Methods
【24h】

Bolmen Tunnel Project - Evaluation of Geophysical Site Investigation Methods

机译:Bolmen隧道工程 - 地球物理场地勘察方法评估

获取原文

摘要

The report presents geophysical measurements along and adjacent to the tunnel and an evaluation of the ability of the various methods to permit prediction of rock mass parameters of significance to stability and water bearing ability. The evaluation shows that, using airborne electro-magnetic surveys, it was possible to indicate about 80% of alla the zones of weakness more than 50 m wide in the tunnel. Airborne magnetic surveys located about 90% of all dolerite dykes more than 10 m wide. Ground-level VLF and Slingram methods of electro-magnetic measurement indicated 75% and 85% respectively of all zones of weakness more than 50 m wide. Resistivity methods were successfully used to locate clay filled and water-bearing fracture zones. About 75% of the length of tunnel over which resistivity values below 500 ohm m were measured required shotcrete support and pre-grouting. (ERA citation 14:002004)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号