首页> 美国政府科技报告 >ASEA 60/2 Industrial Robot Project Bardons and Oliver Cut-off Lathe Application
【24h】

ASEA 60/2 Industrial Robot Project Bardons and Oliver Cut-off Lathe Application

机译:asEa 60/2工业机器人项目Bardons和Oliver截止车床应用

获取原文

摘要

The scope of this document is to define a test plan for the testing of the ASEA 60/2 industrial robot at the Bardons and Oliver (B and O) cut-off lathe in Plant 6. This test plan describes the administrative procedures to be used and the general responsibilities of the Westinghouse Materials Company of Ohio (WMCO) organizations which are most involved in the preparation, coordination, and conduct of the installation, startup, and testing. Any deviations to this procedure will be approved by the test coordinator, Manager, Development, and Plant 6 Supervisor. The purpose of this test is to evaluate the ASEA 60/2 industrial robot to determine the feasibility of implementing a robot at the Bardons and Oliver cut-off lathe in Plant 6 for material handling purposes. This robot will be used as a developmental robot in that it will be installed temporarily at the B and O and then be relocated to another application. The robot will be used for training purposes to familiarize personnel with programming, computer usage, maintenance, and operation of the robot. Radiation exposure reduction of the machine tool operators in Plant 6 will also be determined. Success of the testing will be measured by the amount of radiation exposure reduction and determining the complexity of incorporating automated machinery with the B and O cut-off lathe utilizing a robot. (ERA citation 13:043628)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号