首页> 美国政府科技报告 >TSTA (Tritium Systems Test Assembly) Loop Operation with 100 Grams-Level of Tritium. Full Components Milestone Run in June, 1988
【24h】

TSTA (Tritium Systems Test Assembly) Loop Operation with 100 Grams-Level of Tritium. Full Components Milestone Run in June, 1988

机译:TsTa(氚系统测试组件)具有100克氚水平的环路操作。完整组件里程碑运行于1988年6月

获取原文

摘要

A fully integrated loop operation test of Tritium systems Test Assembly (TSTA) with 107 grams of tritium was completed at Los Alamos National Laboratory (LANL) in June, 1988. In this test, a compound cryopump with a charcoal panel was incorporated into the main process loop for the first time. The objectives were to demonstrate the compound cryopump system with different flow rates and impurities, to demonstrate the regeneration of the compound cryopump system, to accumulate operating experience with other process systems such as the fuel cleanup system, the isotope separation system, the tritium supply and recovery system, etc. and to improve the data-base on TSTA safety systems such as the secondary containment system, tritium waste treatment system and tritium monitoring system. This report briefly describes characteristics of the main subsystems observed during the milestone run. (ERA citation 14:023863)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号