首页> 美国政府科技报告 >Analysis of a High Pressure ATWS (Anticipated Transient Without Scram) with Very Low Make-Up Flow.
【24h】

Analysis of a High Pressure ATWS (Anticipated Transient Without Scram) with Very Low Make-Up Flow.

机译:具有极低补偿流量的高压aTWs(无扰动的预期瞬态)的分析。

获取原文

摘要

A series of calculations were performed to analyze the response of General Electric Company's (GE) advanced boiling water reactor (ABWR) during an anticipated transient without scram (ATWS). This work investigated the early plant response with an assumed failure or manual inhibit of the high pressure core flooder (HPCF). Consequently, the reactor core isolation cooling (RCIC) and control rod drive (CRD) systems are the only sources of high pressure injection available to maintain core cooling. Steam leaving the reactor pressure vessel was diverted to the pressure suppression pool (PSP) via the steam line and the safety relief valves. The combination of an unscrammed core and the CRD and RCIC injection sources make this a particularly challenging transient. System energy balance calculations were performed to predict the core power and PSP heat-up rate. The amount of vessel vapor superheat and the PSP temperature were found to significantly affect the resultant core power. Consequently, detailed thermal-hydraulic calculations were performed to simulate the system response during the postulated transient. 15 refs., 15 figs., 4 tabs. (ERA citation 14:011074)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号