首页> 美国政府科技报告 >Low-Head Hydroelectric Power Demonstration Project, City of Gonzales, Texas: Final Operation and Maintenance Report
【24h】

Low-Head Hydroelectric Power Demonstration Project, City of Gonzales, Texas: Final Operation and Maintenance Report

机译:德克萨斯州冈萨雷斯市低水头水电示范项目:最终运行和维护报告

获取原文

摘要

The purpose of this report is to summarize the first two years of operation of this project beginning January 1984 and ending December 1985. The report includes descriptions of equipment procurement, on-site construction contracts, and installation of turbines and generators. (ERA citation 13:035946)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号