首页> 美国政府科技报告 >SP-100 Ground Engineering Systems: Test Facility Control Systems
【24h】

SP-100 Ground Engineering Systems: Test Facility Control Systems

机译:sp-100地面工程系统:测试设施控制系统

获取原文

摘要

One of the major objectives of the current phase of the SP-100 program is to demonstrate the performance of a full-scale, prototypic nuclear subsystem of a 100 kWe space nuclear power supply. Such a test is planned at the SP-100 Test Site located at US Department of Energy facilities near Richland, Washington. Considerations involved in selecting a design for the central, integrated facility control system which will control and monitor the performance of the nuclear subsystem and supporting facility systems are discussed. These considerations have been translated into the design of a modern, commerically available, microprocessor based control and monitoring system, using color graphics techniques for the operator interface. (ERA citation 13:033553)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号