首页> 美国政府科技报告 >Expediting Cleanup at the Weldon Spring Site under CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act) and NEPA (National Environmental Policy Act)
【24h】

Expediting Cleanup at the Weldon Spring Site under CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act) and NEPA (National Environmental Policy Act)

机译:根据CERCLa(综合环境响应,赔偿和责任法案)和NEpa(国家环境政策法案)加快Weldon spring站点的清理工作

获取原文

摘要

The Weldon Spring Site Remedial Action project is being conducted under the Surplus Facilities Management Program of the US Department of Energy (DOE). The DOE has developed an environmental compliance strategy for this project to meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the National Environmental Policy Act (NEPA). A key element of this strategy was the development of an integrated CERCLA/NEPA process to minimize, to the extent possible, the need to prepare duplicate documentation. Additionally, the project is implementing various expedited response actions to mitigate actual or potential uncontrolled releases if radioactively or chemically hazardous substances to the environment and to minimize potential health and safety risks to on-site personnel and local human and biotic populations. These actions are being conducted concurrently with the preparation of major environmental compliance documentation. The initiation of site cleanup via these response actions has fostered a very positive relationship with the US Environmental Protection Agency Region VII, the state of Missouri, and the affected public. 2 refs., 3 figs.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号