首页> 美国政府科技报告 >Scenarios for ITER (International Thermonuclear Experimental Reactor) Steady-State and Technology Testing Operation.
【24h】

Scenarios for ITER (International Thermonuclear Experimental Reactor) Steady-State and Technology Testing Operation.

机译:ITER(国际热核实验反应堆)稳态和技术测试操作的情景。

获取原文

摘要

Operational scenarios for the International Thermonuclear Experimental Reactor (ITER) steady-state and technology testing phases are identified by trade-offs among wall load, burn time, and divertor heat loads. Steady-state operation with Q (ge) 5 is limited to wall loads (ge)0.5 MW/m(sup 2) and injection powers (ge) 100 MW. Even at steady-state wall loads of 0.5 MW/m(sup 2), the divertor heat loads are higher than predicted for the physics phase. For technology testing, hybrid operation (with simultaneous inductive and noninductive current drive) results in a wall load of 0.8 MW/m(sup 2), with injection power of about 100 MW, and a burn time of about 1200 s, with a divertor heat load similar to that of the physics phase. Significant uncertainty exists in our present understanding of the divertor conditions. Should conditions prove to be more favorable than assumed here, the operational windows would open considerably. For factor of (approx)3 reductions in predicted divertor loads, we show potential steady-state cases at wall loads of 0.8 MW/m(sup 2), injection powers of about 130 MW, and Q near 7. With factors of (approx)1.5--2.5 reduction in the predicted divertor loads, hybrid technology testing could be accomplished with wall loads of 0.8 MW/m(sup 2) burn times of 1--3 h, and injection powers of 100--150 MW. 5 refs., 3 figs., 2 tabs.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号