首页> 美国政府科技报告 >Discounted-cost continuous-time flexible manufacturing and operator scheduling model solved by deconvexification over time.
【24h】

Discounted-cost continuous-time flexible manufacturing and operator scheduling model solved by deconvexification over time.

机译:折扣成本的连续时间灵活制造和操作员调度模型通过随着时间的推移解除解决。

获取原文

摘要

A discounted-cost, continuous-time, infinite-horizon version of a flexible manufacturing and operator scheduling model is solved. The solution procedure is to convexify the discrete operator-assignment constraints to obtain a linear program, and then to regain the discreteness and obtain an approximate manufacturing schedule by deconvexification of the solution of the linear program over time. The strong features of the model are the accommodation of linear inequality relations among the manufacturing activities and the discrete manufacturing scheduling, whereas the weak features are intra-period relaxation of inventory availability constraints, and the absence of inventory costs, setup times, and setup charges.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号