首页> 美国政府科技报告 >Materials experience of the public domain portions of Tube Bank 'E' during Test Series A2. Final report.
【24h】

Materials experience of the public domain portions of Tube Bank 'E' during Test Series A2. Final report.

机译:测试系列a2期间Tube Bank'E'的公共领域部分的材料经验。总结报告。

获取原文

摘要

The tube banks at the grimethorpe pressurized fluidized bed combustion facility are discussed. Tube Bank ''E'' was designed for operation as the in bed heat exchanger during Test Series A2 at the Grimethorpe PFBC Establishment between March and November 1987. The supply of the tube bank resulted from an agreement between Foster Wheeler Development Corporation (FWDC), the US Department of Energy, and the Operating Agent for the British Coal/CEGB Joint Programme on PFBC. The tube bank incorporated features, designed to produce acceptable and predictable wastage characteristics, suggested by both FWDC and BCC/CEGB interests. As part of the agreement between the various parties, it was agreed only data from 55% of the tube bank would enter the public domain. This report describes the tube bank, and describes and discusses the public domain wastage results following a total operating period approaching 1450 hours. It is concluded that although conditions varied throughout Test Series A2, there were no major differences in the aggressiveness of the bed. Armouring devices suggested by FWDC were not successful, but their chromised coatings offered promise. The results from UK proprietary parts of the tube bank indicated that the tube bank metal wastage need not be a life limiting problem for PFBC in-bed heat exchangers. 5 refs., 48 figs., 6 tabs.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号