首页> 美国政府科技报告 >Addendum to engineering evaluation/cost analysis for the proposed management of 15 nonprocess buildings (15 Series) at the Weldon Spring site chemical plant, Weldon Spring, Missouri.
【24h】

Addendum to engineering evaluation/cost analysis for the proposed management of 15 nonprocess buildings (15 Series) at the Weldon Spring site chemical plant, Weldon Spring, Missouri.

机译:在密苏里州Weldon spring的Weldon spring工厂化工厂管理15个非加工建筑(15系列)的工程评估/成本分析附录。

获取原文

摘要

An engineering evaluation/cost analysis (EE/CA) report was prepared in May 1989 to analyze alternatives for a proposed removal action to manage 15 nonprocess buildings, designated as the 15 Series buildings, at the chemical plant area of the Weldon Spring site. The alternative selected as a result of the analyses was to dismantle the buildings and to salvage or transport off-site for treatment or disposal all nonradioactively contaminated materials and to store on-site in a material staging area (MSA) all radioactively contaminated materials, pending a decision for disposal of all wastes resulting from remediation of the Weldon Spring site. Region VII of the US Environmental Protection Agency (EPA) and the state of Missouri concurred with the selection of this alternative and provided comments on the EE/CA report. The proposed removal action was not initiated at that time due to funding constraints. This addendum has been prepared to update information provided in the EE/CA report, provide additional information on the MSA, and respond to EPA Region VII and state of Missouri comments on the EE/CA. 5 refs., 1 tab.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号