首页> 美国政府科技报告 >Remedial Action Plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Spook, Wyoming. Volume 2, Appendix F, Final plans and specifications: Final report.
【24h】

Remedial Action Plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Spook, Wyoming. Volume 2, Appendix F, Final plans and specifications: Final report.

机译:用于稳定怀俄明州spook的非活性铀矿尾矿场的补救行动计划和场地概念设计。第2卷,附录F,最终计划和规范:最终报告。

获取原文

摘要

Contents of this volume include: bidding requirements; terms and conditions; specifications for general requirements; specifications for sitework; and subcontract drawings.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号