This paper describes the approach that was taken in developing safeguards and security design criteria to be used for the Special Isotope Separation (SIS) Production Plant. The US Department of Energy has postponed the construction of the SIS Production Plant that was to be built at the Idaho National Engineering Laboratory (INEL) site located near Idaho Falls, Idaho. The SIS Plant planned to isotopically enrich plutonium utilizing the Atomic Vapor Laser Isotope Separation (AVLIS) process developed at the Lawrence Livermore National Laboratory. Westinghouse Idaho Nuclear Co., Inc. as a prime contractor to the DOE Idaho Operations Office, was to operate the Plant.
展开▼