Waste Isolation Pilot Plant dry bin-scale integrated systems checkout plan.

机译:废物隔离试验工厂干燥箱秤综合系统检验计划。

获取原文

摘要

The Integrated Systems Checkout Plan (ISCP) addresses a two-phase approach to ensuring WIPP readiness to support the Dry Bin-Scale CH TRU Waste Test. The first phase includes all those activities necessary to ensure readiness of individual systems and equipment. The second phase is a bin-scale integrated checkout using four mock bins. The ISCP has been developed to provide assurance that operational activities dedicated to supporting the bin-scale tests can be achieved safely. To attain this assurance, a systematic approach will address: development of procedures to control system and equipment start-up and acceptance tests; development of procedures to control operation of systems and equipment, waste receipt, emplacement, operation, test termination, waste retrieval, and post-test shipping; monitoring of systems installation and checkout to ensure systems meet acceptance testing criteria; initial operation of systems to validate procedural controls; training of personnel to perform systems operational activities in accordance with procedural controls; capability of corrective action for abnormal events; and documentation of acceptance testing data and personnel training and qualification requirements. 11 refs., 7 figs., 2 tabs.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号