首页> 美国政府科技报告 >Programmatic issues affecting the implementation of the DOE five-year plan.
【24h】

Programmatic issues affecting the implementation of the DOE five-year plan.

机译:影响美国能源部五年计划实施的计划性问题。

获取原文

摘要

In this paper, I identify programmatic challenges the US Department of Energy's Office of Environmental Restoration and Waste Management (EM) faces in the implementation of its five-year plan. I've characterized these challenges in the form of propositions, written specific challenges for these propositions, and summarized EM's situation in dealing with the propositions and related challenges, and I conclude with what I believe are the make-or-break situations for EM. 10 refs., 2 figs.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号