首页> 美国政府科技报告 >Closeout of IE Bulletin 85-01: Steam Binding of Auxiliary Feedwater Pumps.
【24h】

Closeout of IE Bulletin 85-01: Steam Binding of Auxiliary Feedwater Pumps.

机译:IE Bulletin 85-01的结束:辅助给水泵的蒸汽结合。

获取原文

摘要

Documentation is provided in the report for the closeout of IE Bulletin 85-01 regarding steam binding of auxiliary feedwater pumps for certain pressurized water reactors (PWRs) in nuclear power facilities. Individual facility closeouts are based on the implementation and verification of the three actions required by the bulletin. Evaluation of utility responses and NRC/Region inspection reports indicates that the bulletin is closed for 44 (92%) of the 48 facilities to which it was issued for action. Followup items are proposed for the use of NRC regional inspectors in ensuring satisfactory completion of required actions for the four facilities with open bulletin status. Conclusions are summarized in accordance with Generic Letter 88-03, which announced the NRC Staff's resolution of Generic Issue 93 on the subject of the bulletin.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号