Surface Water Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document for South Walnut Creek Basin (Operable Unit No. 2). Public Comment Responsiveness Summary: Final report.

机译:南核桃溪流域(2号可操作单元)地表水中期措施/临时补救行动计划/环境评估和决策文件。公众意见响应性摘要:最终报告。

获取原文

摘要

The Department of Energy (DOE) is pursuing an Interim Measure/Interim Remedial Action (IM/IRA) at the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2) at the Rocky Flats Plant (RFP). This IM/IRA is to be conducted to minimize the release from ...