Cost estimates of operating onsite spent fuel pools after final reactor shutdown.

机译:最终反应堆停堆后运行现场乏燃料池的成本估算。

获取原文

摘要

This report presents estimates of the annual costs of operating spent fuel pools at nuclear power stations after the final shutdown of one or more onsite reactors. Its purpose is to provide basic spent fuel storage cost information for use in evaluating DOE's reference nuclear waste management system, as well as alternate systems. The basic model of an independent spent fuel storage installation (ISFSI) used in this study was based on General Electric Corporation's Morris Operation and was modified to reflect mean storage capabilities at an unspecified, or ''generic,'' US reactor site. Cost data for the model came from several sources, including both operating and shutdown nuclear power stations and existing ISFSIs. Duke Power Company has estimated ISFSI costs based on existing spent fuel storage costs at its nuclear power stations. Similarly, nuclear material handling facilities such as the Morris Operation, the West Valley Demonstration Project, and the retired Humbolt Bay nuclear power station have compiled spent fuel storage cost data based on years of operating experience. Consideration was given to the following factors that would cause operating costs to vary among pools: (1) The number of spent fuel pools at a given reactor site; (2) the number of operating and shutdown reactors onsite; (3) geographic location; and (4) pool storage capacity. 10 ref., 6 figs., 7 tabs.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号