首页> 美国政府科技报告 >Safety Evaluation Report Related to the License Renewal of Beaver Valley Power Station, Units 1 and 2, Docket Nos. 50-334 and 50-412. Volume One and Two. Supplement One
【24h】

Safety Evaluation Report Related to the License Renewal of Beaver Valley Power Station, Units 1 and 2, Docket Nos. 50-334 and 50-412. Volume One and Two. Supplement One

机译:与Beaver Valley电站1号和2号机组许可证更新有关的安全评估报告,文件号50-334和50-412。第一和第二卷。补充一

获取原文

摘要

This document is a supplemental safety evaluation report (SSER) for the technical review of the Beaver Valley Power Station (BVPS), Units 1 and 2, license renewal application (LRA) as filed by FirstEnergy Nuclear Operating Company (FENOC or the applicant). By letter dated August 27, 2007, FENOC submitted its application to the United States (US) Nuclear Regulatory Commission (NRC) for renewal of the BVPS, Units 1 and 2, operating licenses (Facility Operating License Numbers DPR-66 and NPF-73, respectively) for a period of 20 years beyond the current operating license. The NRC staff issued a safety evaluation report (SER), dated June 8, 2009, which summarizes the results of its safety review of the renewal application for compliance with the requirements of Title 10, Part 54, of the Code of Federal Regulations, (10 CFR Part 54), 'Requirements for Renewal of Operating Licenses for Nuclear Power Plants.' This SSER only provides changes to the June 2009 SER.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号