首页> 美国政府科技报告 >Engineering evaluation/cost analysis for the proposed management of 15 nonprocess buildings (15 series) at the Weldon Spring Site Chemical Plant, Weldon Spring, Missouri. Environmental assessment: Weldon Spring Site Remedial Action Project, Weldon Spring,
【24h】

Engineering evaluation/cost analysis for the proposed management of 15 nonprocess buildings (15 series) at the Weldon Spring Site Chemical Plant, Weldon Spring, Missouri. Environmental assessment: Weldon Spring Site Remedial Action Project, Weldon Spring,

机译:在密苏里州Weldon spring的Weldon spring site化工厂管理15个非过程建筑(15系列)的工程评估/成本分析。环境评估:Weldon spring site Remedial action project,Weldon spring,

获取原文

摘要

The US Department of Energy, under its Surplus Facilities Management Program (SFMP), is responsible for cleanup activities at the Weldon Spring site, located near Weldon Spring, Missouri. The site consists of two noncontiguous areas: (1) a raffinate pits ...

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号