首页> 美国政府科技报告 >Depleted uranium manufacturing waste minimization at the Oak Ridge Y-12 Plant
【24h】

Depleted uranium manufacturing waste minimization at the Oak Ridge Y-12 Plant

机译:Oak Ridge Y-12工厂的贫铀制造废物最小化

获取原文

摘要

The Y-12 Plant, managed by Martin Marietta Energy Systems for the Department of Energy has a comprehensive waste minimization program associated with the depleted uranium manufacturing. The program addresses all phases of the depleted uranium manufacturing from the initial casting to the finished product. The program addresses both by-product and waste in the manufacturing operations. Investigations are ongoing for process changes, process improvements, near-net shape processes, and other technology or business changes that will minimize waste. A detailed model of the manufacturing process is being developed.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号